Security Labs SL800 Manuel d'installation

Naviguer en ligne ou télécharger Manuel d'installation pour Ouvreur de porte Security Labs SL800. Security Labs SL800 Installation manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 45
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
AUTOMATIC GATE OPERATOR
FOR VEHICULAR SLIDE GATES
INSTALLATION MANUAL FOR THE PROFESSIONAL INSTALLER
3121 Hartsfield Road • Tallahassee, Florida, USA 32303
Telephone (800) 543-GATE or (850) 575-0176 • Fax (850) 575-8912 • www.gtoinc.com
DO NOT INSTALL THIS OPERATOR WITHOUT SAFETY EDGES AND ROLLER GUARDS!
This product meets and exceeds the requirements of UL 325, the standard which regulates gate operator safety, as
established and made effective March 1, 2000, by Underwriters Laboratories Inc.
WARNING!
READ ALL INSTRUCTIONS COMPLETELY before attempting installation
and use; failure to do so may result in serious injury or death.
This unit must only be installed by an experienced technician!
Operator power must be disconnected before servicing!
This gate operator produces a high level of force. Stay clear of the unit
while it is operating and exercise caution at all times.
RB270 rev - 09/25/01
Chain
Safety Edge
Roller Guard
Receiver
(cable in separate
conduit)
Roller Guard
Safety Edge
CAUTION
AUTOMATIC GATE
STAND CLEAR
1-800-543-GATE
®
Operator
PRO-SL-2000
(REQUIRED)
(REQUIRED)
Safety Edge
(REQUIRED)
(REQUIRED)
(REQUIRED)
Use PVC Conduit 
(not included)
Run 1000' (max.) of low
voltage wire to control
box from transformer
(wire not included).
120 Volt Indoor
Transformer
(Surge Protector
not supplied)
Roller Guard
(REQUIRED)
Chain Bracket
Chain Bracket
for power cables.
1. KEEP CLEAR! Gate may move at any time.
2. Do not allow children to operate gate or
play in gate area.
3. This gate is for vehicles only. Pedestrians
must use a separate entrance.
Moving Gate Can Cause
Injury Or Death
WARNING
!
Vue de la page 0
1 2 3 4 5 6 ... 44 45

Résumé du contenu

Page 1 - WARNING!

AUTOMATIC GATE OPERATOR FOR VEHICULAR SLIDE GATESINSTALLATION MANUAL FOR THE PROFESSIONAL INSTALLER3121 Hartsfield Road • Tallahassee, Florida, USA 32

Page 2 - Temperature

7IMPORTANT SAFETY INSTRUCTIONSThese warning labels should be found at the locations specified below. If any of them are missing, immediatelycontact y

Page 3 - TABLE OF CONTENTS

8These warning labels should be found at the locations specified below. If any of them are missing, immediatelycontact your installer for replacement

Page 4

9DRIVE• Powered by a 12 V motor with integral case hardened steel gear reduction to 90 rpm. Generates 155 in. lb. of torque at 12V. Motor temperatur

Page 5

10DRIVE• Powered by a 12 V motor with integral case hardened steel gear reduction to 90 rpm. Generates 310 in. lb. of torque at 12V. Motor temperatu

Page 6

11PARTS IDENTIFICATION(8) 3/8” Serrated Nuts(2) Quick Release Pins(2) Chain Master Links(4) 3/8”-16 x 2”diameter U-Bolts(4) 1/4”-20 x 1/2” Screws(2) C

Page 7

12SINGLE GATE OPERATOR INSTALLATIONOVERVIEW OF OPERATOR INSTALLATIONGATE PREPARATIONLevelPlumbConcreteConcreteBe sure the gate is properly installed a

Page 8

13RECOMMENDED WIRING AND USE OF CONDUITCAUTIONAUTOMATIC GATESTAND CLEAR1-800-543-GATE®Separate PVC Conduits for power, receiver and control wiring.

Page 9

14STEP 2Install chain brackets at each end of the gate on the inside(operator side) of the gate (see Overview Illustration, page.11). Position the top

Page 10 - IMPORTANT SAFETY INSTRUCTIONS

15STEP 5After the concrete has hardened, remove the stringfrom the quick release pins. Attach the chain to onequick release pin with a master link (se

Page 11

16POWERING THE SYSTEMMake sure the control box power switchis in the OFF position.ON-OFFOFFCONNECTING THE BATTERYINSTALLATION OF THE GTO TRANSFORMERST

Page 12 - Gate Length

Conversion ChartVEHICULAR GATE OPERATOR CLASS CATEGORIESResidential Vehicular Gate Operator-Class I: A vehicular gate operator (or system) intended fo

Page 13

17Winter Ratings Watts Zone 1 Zone 2 Zone 3SL1000 10 4 8 13SL1000 15 6 12 20SL1000 20 8 16 26Dual SL1000 15 3 6 10Dual SL1000 20 4 8 13Requires 40 A

Page 14 - PARTS IDENTIFICATION

18STEP 11:Feed the low voltage wires upward through thestrain relief on the bottom of the control box (seeIllustration J). Pull 6" to 8" of

Page 15 - GATE PREPARATION

19STEP 12:Strip 3/16" off the ends of the low voltage wire andtwist tightly. These wire ends will be attached tothe control board at the 18VAC

Page 16 - Operator

20CONTROL BOARD SETTINGS1234ONOBSTRUCTSENS.PULL/PUSHSEQ1SNGL/DUALSEQ2LEARNDIP switchesMIN MAXThe four DIP switches on the control board match the oper

Page 17 - Chain Bracket

21POTENTIOMETERSThe three (3) potentiometers on the control board operate like a volume control on a radio. They control theauto close timer, inertia

Page 18 - INSTALLING THE CHAIN

22SETTING THE PERSONAL TRANSMITTER CODE1. REMOVE THE TRANSMITTER COVERGrasp the sides of the access cover and slide it away from thetransmitter butto

Page 19 - POWERING THE SYSTEM

232. SET THE TRANSMITTER DIP SWITCHESThere are nine (9) transmitter DIP switches; each of which can be placed in threedifferent positions (+, 0, –).

Page 20 - SOLAR ZONES AND GATE ACTIVITY

24 Limit Nut BClosed position stop –if gate opens right to left.Open position stop –if gate opens left to right. Limit Nut AOpen posi

Page 21 - STEP 10:

25CONNECTING SAFETY DEVICESThe GTO/PRO SL-1000 and SL-2000 series operators are equipped with built-in obstruction sensitivity. Theseoperators are de

Page 22 - STEP 13:

26COMPATIBLE SAFETY DEVICESSAFETY EDGESMiller Edge, Inc.MC-22ME-110 through 113ME-120ME-123MG-020MT-21 and 22MU-22Tapeswitch Corporation101-B and BMT1

Page 23 - CONTROL BOARD SETTINGS

TABLE OF CONTENTSGate Operator Class Categories -------------------------------------------------------- inside coverImportant Safety Instructions ---

Page 24

27CONNECTING ACCESSORIESThe ACCESSORY terminal block is the connection point for accessories such as push buttons, safety loops,intercoms, etc. The A

Page 25 - BLACK Wire

28Mount the operator housing afterall installation procedures arecomplete. Slide operator housingover legs, align holes, and usescrews provided to att

Page 26 - MOUNTING THE RECEIVER

29MAINTENANCEGATEHaving a well maintained gate will ensure that the operator runs smoothly and safely. Make sure gate is hunglevel and plumb. Check an

Page 27 - ADJUSTING THE LIMIT SWITCHES

30TROUBLE SHOOTING GUIDEMaintenance:• On all gates weighing 250 lb. or more, routinely grease the ball bearing rollers at least 4 times a year; grease

Page 28 - CONNECTING SAFETY DEVICES

31The GTO, Inc. Technical Service Department is openMonday – Thursday 7:30 A.M. – 5:30 P.M.and Friday 8:00 A.M. - 12:00 P.M. (Eastern Time)TELEPHONE (

Page 29 - COMPATIBLE SAFETY DEVICES

32If the GTO gate operator system is not operating properly and you have not been able to solve the problem, pleasefollow the steps below:1. Check the

Page 30 - CONNECTING ACCESSORIES

33INSTRUCTIONS FOR THE INSTALLATION OFA DUAL GATE SYSTEMUSE THE GTO/PRO SL-2200 WITH THEGTO/PRO 2000 FOR DUAL GATESAUTOMATIC GATE OPERATORS®

Page 31 - ATTACHING THE HOUSING

34DUAL GATE SYSTEM INSTALLATION(8) 3/8” Serrated Nuts(2) Quick Release Pins(2) Chain Master Links(4) 3/8”-16 x 2” dia.U-Bolts(4) 1/4”-20 x 1/2” Screws

Page 32 - MAINTENANCE

35PREPARING THE GATESInstall PVC conduit (not included) needed for power cables and low voltage wiring – see illustration below. ThePRO SL-1200 and Sl

Page 33 - TROUBLE SHOOTING GUIDE

36 Limit Nut AOpen position stop –if gate opens right to left.Closed position stop –if gate opens left to right. Limit Nut BClosed po

Page 34 - SYSTEM TEST SPECIFICATIONS

1IMPORTANT SAFETY INSTRUCTIONSBecause automatic gate operators produce high levels of force, all system designers, installers, and consumers havean ob

Page 35 - WARRANTY AND REPAIR SERVICE

37SETTING THE CONTROL BOARD FOR DUAL GATE INSTALLATIONSDIP SWITCHESThe Control Board DIP switches must be set to accommodate your particular type of i

Page 36 - GTO/PRO 2000 FOR DUAL GATES

38FIRST OPERATOR OPENS FIRST,SECOND OPERATOR CLOSES FIRSTSEQ1 = OFF SEQ2 = ONIf SEQ1 is set to OFF, and SEQ2 is set to ON, theFIRST OPERATOR will

Page 37 - DUAL GATE SYSTEM INSTALLATION

39GTO Entry Transmitter (RB741)The GTO Entry Transmitter, withadjustable code settings, is standardequipment with all GTO gate operatorsystems. Batt

Page 38 - PREPARING THE GATES

40ACCESS-ORIESGTO Low Voltage Wire (RB509)The 16 gauge dual conductor, multi-stranded, direct burial low voltage wireis required to connect the contro

Page 39 - WIRING THE SECOND OPERATOR

41Replacement BatteriesRB500 – The standard 12 volt, 7.0 ampere-hour, maintenance-free battery for all GTO/PROgate operators. This is the only battery

Page 40 - SENS

INSTALLATION CHECK LISTThe installation of this operator conforms to CLASS __________.The installer verifies that (each item must be checked):___ Requ

Page 41

2IMPORTANT SAFETY INSTRUCTIONS FOR THE SYSTEM DESIGNERWARNING: To reduce the risk of injury or death:1. READ AND FOLLOW ALL INSTRUCTIONS.2. This opera

Page 42 - SECURITY GATE LOCK

3IMPORTANT SAFETY INSTRUCTIONS6. Secure outdoor or easily accessed gate operator controls in order to prohibit unauthorized use of the gate.III. After

Page 43 - ACCESS-ORIES

4IMPORTANT SAFETY INSTRUCTIONSSECONDARY MEANS OF PROTECTION AGAINST ENTRAPMENTAs specified by Underwriters Laboratories Inc. UL 325 (30A.1.1), automat

Page 44

5IMPORTANT SAFETY INSTRUCTIONSFOR THE CONSUMER/END USERWARNING: To reduce the risk of injury or death:1. READ AND FOLLOW ALL INSTRUCTIONS.2. Distribut

Page 45 - INSTALLATION CHECK LIST

6IMPORTANT SAFETY INSTRUCTIONSINSTALL SCREEN GUARD OVER GATE AND FENCEInjuries may occur when people place their hands, arms, legs, etc., through open

Commentaires sur ces manuels

Pas de commentaire